Thursday, February 12, 2009

More photos of my two door apartment project

.
.
Window installation on 25th day


Started concrete wall finishing on 31st day

This is the fourth of a series of my posts on building my two door apartment project. I’m on the 36th day of construction now and with staggering expenses of P275,000 and counting…and ouchhh, when will this end…
Construction is on its final stages, concrete wall finishing, electrical and plumbing layout, bathroom and kitchen and sink tiling.
.
.
Looking on details of ceiling

More on bill of materials:

Quarter “C” round x8ft = P47
Quarter “C” round 10ft = P58
Quarter “C” round 12ft = P70
Paint 1 Pail Roof Sheen, Spanish Red = P1750
Bathroom and Kitchen Sink, Tile 8” x 8” = P9.50
Paint, 1 Pail, Latex Flat (Nation brand) = P1150
Paint, 1 Pail, Latex Gloss (Nation) = 1600
Paint, 1 Pail Latex with color = P2100
Faucet Plastic = P80
Shower shut off valve, Plastic = P250
Electrical, one half Pvc Pipe, Orange, Neltex brand = P85
Ordinary, non brand, Electrical PVC Pipe = P55
Electrical Switch box 30 Amp Rating = P220
Electrical Wire Stranded #8 = P46/meter
Electrical Wire Stranded #10 = P39/meter
Electrical Conduit pipe three fourth size = P495
Electrical G bushing rod 1” x3/4” = P33



and on 34th day.......
.
.

1 comment:

Anonymous said...

Thanks for posting these. I am learning something new specially the prices of materials and labor there. Keep it up. Good luck.
J. G. Marasigan